Section 40.0442 - Scope and Types of Release Abatement Measures
Current through Register 1531, September 27, 2024
(1) The scope and complexity of Release Abatement Measures shall be commensurate with the amount of information known about, and the degree of risk associated with, release and disposal site conditions. A Release Abatement Measure shall not:
(2) Release Abatement Measures conducted in accordance with the provisions of 310 CMR 40.0442(1) may include, without limitation:
(3) Notwithstanding 310 CMR 40.0442(1)(d), Release Abatement Measures may include construction of a structure that could prevent or impede the implementation of likely response actions in the future, provided that prior to or concurrent with conducting such construction activities, the following are completed for the area within and adjacent to the footprint of the proposed structure in a manner that achieves the substantive technical standards set forth in 310 CMR 40.0800 and 40.0900:
(4) A permanent cap or Engineered Barrier, as defined in 310 CMR 40.0998, that is constructed as a Release Abatement Measure will not be considered part of a Permanent Solution at a disposal site, unless and until a Phase III performed pursuant to the provisions of 310 CMR 40.0850 demonstrates the lack of a feasible alternative.
(5) Release Abatement Measures shall not involve the excavation of greater than 1500 cubic yards (cumulative, for the disposal site in question) of soil contaminated by oil and/or hazardous material at concentrations equal to or greater than applicable Reportable Concentrations, unless a statement is provided in the Release Abatement Measure Plan by the RP, PRP or Other Person conducting response actions certifying that, based upon information and opinions provided by an LSP, such persons have sufficient financial resources to manage excavated materials in the manner and time frames specified at 310 CMR 40.0030.