Code of Massachusetts Regulations
310 CMR - DEPARTMENT OF ENVIRONMENTAL PROTECTION
Title 310 CMR 19.000 - Solid Waste Management
Part I - GENERAL REQUIREMENTS, PROCEDURES AND PERMITS
Section 19.011 - Signatories, Certification and Engineer's Supervision
Current through Register 1531, September 27, 2024
(1) Signatories and General Certification. Any application for a permit, authorization to construct, authorization to operate, permit modification, and any determination, certification, report and any other document submitted to the Department pursuant to 310 CMR 19.000, shall be signed by the appropriate responsible official. Any person required by 310 CMR 19.000 or any order or other enforcement document issued by the Department, to submit any document to the Department shall identify himself or herself by name, profession, and relationship to the applicant and legal interest in the facility, and make the following statements:
I, [name of responsible official], attest under the pains and penalties of perjury that:
(2) Engineering Supervision. 310 CMR 19.011(2) does not apply to any documents submitted to the Department pursuant to 310 CMR 19.018. All papers pertaining to design, construction, operation, maintenance, or engineering of a site or a facility shall be completed under the supervision of a Massachusetts registered professional engineer knowledgeable in solid waste facility design, construction and operation and shall bear the seal, signature and discipline of said engineer. The soils, geology, air modeling, air monitoring and groundwater sections of an application or monitoring report shall be completed by competent professionals experienced in the fields of soil science and soil engineering, geology, air modeling, air monitoring and groundwater, respectively, under the supervision of a Massachusetts registered professional engineer. All mapping and surveying shall be completed by a registered surveyor.