Code of Massachusetts Regulations
310 CMR - DEPARTMENT OF ENVIRONMENTAL PROTECTION
Title 310 CMR 15.000 - The State Environmental Code, Title 5: Standard Requirements for the Siting, Construction, Inspection, Upgrade and Expansion of On-site Sewage Treatment and Disposal Systems and for the Transport and Disposal of Septage
Subpart C - DESIGN, CONSTRUCTION, REPAIR, AND REPLACEMENT OF ON-SITE SEWAGE DISPOSAL SYSTEMS
- Section 15.201 - Type of System
- Section 15.202 - Use of Recirculating Sand Filters
- Section 15.203 - System Sewage Flow Design Criteria
- Section 15.204 - Increases in Design Flow to System
- Section 15.211 - Minimum Setback Distances
- Section 15.212 - Depth to Groundwater
- Section 15.213 - Construction in Velocity Zones and Floodways
- Section 15.214 - Designation of Nitrogen Sensitive Areas
- Section 15.215 - Nitrogen Loading Limitations
- Section 15.216 - Aggregate Determinations of Flows and Nitrogen Loadings
- Section 15.217 - Systems with Enhanced Nitrogen Removal
- Section 15.220 - Preparation of Plans and Specifications
- Section 15.221 - General Construction Requirements for All System Components
- Section 15.222 - Building Sewers
- Section 15.223 - Septic Tanks
- Section 15.224 - Multiple Compartment Tanks
- Section 15.225 - Tanks in Series
- Section 15.226 - Construction of Septic Tanks
- Section 15.227 - Placement and Construction of Tees
- Section 15.228 - Placement and Accessibility of Septic Tank
- Section 15.229 - Pumping to Septic Tanks
- Section 15.230 - Pretreatment Units - Grease Traps
- Section 15.231 - Dosing Chambers and Pumps
- Section 15.232 - Distribution Boxes
- Section 15.233 - Siphons
- Section 15.240 - Soil Absorption Systems
- Section 15.241 - System Venting
- Section 15.242 - LTAR - Effluent Loading Rates
- Section 15.243 - Types of Soil Textural Classes
- Section 15.244 - Types of Soils
- Section 15.245 - Soil Absorption System Siting Requirements
- Section 15.246 - Excavation and Flagging of Soil Absorption System
- Section 15.247 - Aggregate
- Section 15.248 - Reserve Area
- Section 15.249 - Design Criteria for Soil Absorption Systems
- Section 15.251 - Trenches
- Section 15.252 - Beds or Fields
- Section 15.253 - Pits, Galleries, or Chambers
- Section 15.254 - Pressure Dosing and Pressure Distribution
- Section 15.255 - Construction in Fill
- Section 15.260 - Tight Tanks
- Section 15.262 - Greywater Systems
- Section 15.280 - Approval of Alternative Systems
- Section 15.281 - Purpose
- Section 15.282 - Types of Alternative Systems
- Section 15.283 - Process for Review of Alternative System Proposals
- Section 15.284 - Approval for Remedial Use
- Section 15.285 - Approval for Piloting
- Section 15.286 - Provisional Approval of Alternative System
- Section 15.287 - General Conditions for Use of Alternative Systems Pursuant to 310 CMR 15.284 through 15.286
- Section 15.288 - Certification of Alternative Systems for General Use
- Section 15.289 - Humus/Composting Toilets
- Section 15.290 - Shared Systems
- Section 15.291 - Division of a Facility and Upgrades Using Shared Systems
- Section 15.292 - New Construction or Increased Flow to Existing Systems and Division of a Facility Using Shared Systems
Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.