Code of Massachusetts Regulations
225 CMR - DEPARTMENT OF ENERGY RESOURCES
Title 225 CMR 22.00 - Massachusetts Stretch Code and Specialized Code 213 For Low-rise Residential
Chapter 4 - [RE] RESIDENTIAL ENERGY EFFICIENCY
Section R401 - GENERAL
Current through Register 1531, September 27, 2024
R401 Replace Section R401.1 and R401.2 as follows:
Exception: Additions under 1,000 sf, level 1 and level 2 alterations, and repairs to existing buildings complying with Chapter 5 [RE].
R402.1.5.1 Add Subsection R402.1.5.1 as follows:
R402.1.5.1 Approved Software for Total UA Alternative: The following software is approved for demonstrating Total UA compliance:
REScheck-Web for IECC2021 Massachusetts stretch code available at
R402.4.1.1 Modify Table R402.4.1.1 to amend the Insulation Installation Criteria as follows:
TABLE R402.4.1.1 AIR BARRIER AND INSULATION INSTALLATION
COMPONENT |
AIR BARRIER CRITERIA |
INSULATION INSTALLATION CRITERIA |
General requirements |
A continuous air barrier shall be installed in the building envelope. Breaks or joints in the air barrier shall be sealed. |
All insulation shall be installed at Grade I quality in accordance with ICC/RESNET 301. Air-permeable insulation shall not be used as a sealing material. |
403.3.5 Insert the following to the end of Subsection R403.3.5:
Postconstruction or rough-in testing and verification shall be done by a HERS Rater, HERS Rating Field Inspector, or an applicable BPI Certified Professional. A written report of the results of the test shall be signed by the party conducting the test and provided to the ode official
R403.6 Replace Section R403.6 as follows:
R403.6 Mechanical Ventilation. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating.
Each dwelling unit of a residential building shall be provided with continuously operating mechanical balanced ventilation system that has been site verified to meet a minimum airflow per either:
Q = .03 x CFA + 7.5 x (Nbr +1) - 0.052 x Q50 x S x WSF
Where: CFA is the conditioned floor area in sq. ft.
Nbr is the number of bedrooms
Q50 is the verified blower door air leakage rate in cfm measured at 50 Pascals
S is the building height factor determined by this table:
Stories above Grade Plane |
1 |
2 |
3 |
S |
1.00 |
1.32 |
1.55 |
WSF is the shielded weather factor as determined by this table:
County |
WSF |
Barnstable |
0.60 |
Berkshire |
0.52 |
Bristol |
0.54 |
Dukes |
0.59 |
Essex |
0.58 |
Franklin |
0.52 |
Hampden |
0.49 |
Hampshire |
0.59 |
Middlesex |
0.55 |
Nantucket |
0.61 |
Norfolk |
0.52 |
Plymouth |
0.53 |
Suffolk |
0.66 |
Worcester |
0.59 |
R403.6.1 Replace Subsection R403.6.1 and Subsections R403.6.1.1 and R403.6.1.2 as follows:
R403.6.3 Replace Subsection R403.6.3 as follows:
R403.6.4 - R403.6.7 Add Subsections R403.6.4 - R403.6.7 as follows:
Exception: HVAC air handlers and remote-mounted fans need not meet sound requirements. There must be at least four feet of ductwork between the remote-mounted fan and intake grille.
Exceptions:
R404.4 Add Section R404.4 and Table R404.4 as follows:
R404.4 Wiring for Electric Vehicle Ready Parking Spaces ("EV Ready Spaces"). EV Ready Spaces shall be provided in accordance with Table R404.4. The dedicated branch circuit shall be identified as "EV READY" in the service panel or subpanel directory, and the termination location shall be marked as "EV READY". The circuit shall terminate in a NEMA receptacle or a Society of Automotive Engineers (SAE) Standard SAE J1772 electrical connector for EV SE servicing Electric Vehicles, located within 6 feet (1828 mm) of each EV ready space. Conductors and outlets for EVSE shall be sized and installed in accordance with the MA electrical code.
TABLE R404.4 EV READY SPACE REQUIREMENTS
Type of Building |
Number of Parking Spaces |
1 & 2 family dwellings and town homes |
At least one 50-amp branch circuit per dwelling unit to provide for AC Level II charging. |
All other R-use buildings |
At least 20% of spaces served with a 40-amp, 208/240-volt circuit with a minimum capacity of 9.6 kVA. |
Exceptions:
R405. Replace Section R405 in its entirety as follows:
Section R405 Passivehouse Building Certification Option.
Projects pre-certified as meeting the Phius CORE 2021 or Phius ZERO 2021 Passive Building Standard - North America, or newer, demonstrated using approved software by Phius, where Phius design-certification is demonstrated by Phius and a Certified Passive House Consultant (CPHC); or, Projects pre-certified as meeting the Certified Passive House standard using the current software and program criteria by the Passive House Institute (PHI), where PHI certification is demonstrated by a Certified Passive House Designer and a Certified Passive House Certifier.
OR
OR
AND
OR
OR
AND
R406.2 Revise TABLE R406.2 as follows:
TABLE R406.2 REQUIREMENTS FOR ENERGY RATING INDEX
SECTIONa |
TITLE |
R403.6.1 |
Heat or Energy Recoveryl Ventilation |
Electrical Power and Lighting Systems |
|
R404.1 |
Lighting equipment |
R404.2 |
Interior lighting controls |
R404.4 |
Wiring for Electric Vehicle Charging Spaces |
R406.3 Reserve this section:
R406.3 Building Thermal Envelope. Reserved.
R406.4 Replace Section R406.4 with the following:
R406.4 Energy Rating Index. The Energy Rating Index (ERI) shall be the RESNET certified HERS index determined in accordance with RESNET/ICC 301. Energy used to recharge or refuel a vehicle used for transportation on roads that are not on the building site shall not be included in the ERI reference design or the rated design.
R406.5 Replace Section R406.5 and Table R406.5 with the following:
R406.5 ERI-based Compliance. Compliance based on an ERI analysis requires that the rated proposed design and confirmed built dwelling be shown to have an HERS index rating less than or equal to the appropriate value indicated in Table R406.5 when compared to the HERS index reference design for each dwelling unit prior to credit for onsite renewable electric generation.
TABLE R406.5 MAXIMUM ENERGY RATING INDEX
Clean Energy Application |
Maximum HERS Index scorea, b |
||
New construction until June 30, 2024 |
New construction permits after July 1, 2024 |
Major alterations, additions, or Change of usec |
|
Mixed-Fuel Building |
52 |
42 |
52 |
Solar Electric Generation |
55 |
42 |
55 |
All-Electric Building |
55 |
45 |
55 |
Solar Electric & All-Electric Building |
58 |
45 |
58 |
a Maximum HERS rating prior to onsite renewable electric generation in accordance with Section R406.5
b The building shall meet the mandatory requirements of Section R406.2, and the building thermal envelope shall be greater than or equal to the levels of efficiency and SHGC in Table R402.1.2 or Table R402.1.4 of the 2015 International Energy Conservation Code.
c Alterations, Additions or Change of use covered by Section R502.1.1 or R503.1.5 are subject to this maximum HERS rating.
R406.5.1 Add Subsection R406.5.1, as follows:
R406.6 Revise Section R406.6 by replacing the reference to Section R406.6 in the first sentence with reference to Section R406.5.