Code of Massachusetts Regulations
220 CMR - DEPARTMENT OF PUBLIC UTILITIES
Title 220 CMR 8.00 - Sales Of Electricity By Qualifying Facilities And On-site Generating Facilities To Distribution Companies, And Sales Of Electricity By Distribution Companies To Qualifying Facilities And On-site Generating Facilities
Section 8.07 - Reporting Requirements

Universal Citation: 220 MA Code of Regs 220.8

Current through Register 1531, September 27, 2024

(1) Each Distribution Company shall file with the Department a report of new Qualifying Facility and On-site Generating Facility activity in a calendar year, by April 1st of the subsequent year. Such filing shall include:

(a) The name and address of the owner, and the address where the Qualifying Facility or On-site Generating Facility is located;

(b) A brief description of the type of Qualifying Facility or On-site Generating Facility;

(c) The primary energy source used by the Qualifying Facility or On-site Generating Facility;

(d) The date of installation and the on-line date;

(e) The method of delivering power to the Distribution Company (contract or net metering);

(f) The design capacity of the Qualifying Facility or On-site Generating Facility;

(g) A brief discussion identifying any Qualifying Facility or On-site Generating Facility that was denied interconnection by the Distribution Company, including a statement of reasons for such denial.

(2) Each Distribution Company shall file with the Department a report describing the incremental reductions in the purchases of electricity during a calendar year due to customer operations of, or purchases from, on-site renewable energy technologies; fuel cells; cogeneration equipment; On-site Generating Facilities eligible for net metering; or cogeneration facilities eligible for net metering. Such filing shall be submitted to the Department by April 1st of the subsequent year, and it shall include:

(a) A brief discussion of the incremental reductions in purchases of electricity during the calendar year due to customer operations of, or purchases from:
1. on-site renewable energy technologies;

2. fuel cells;

3. cogeneration equipment with a combined heat and power system efficiency of at least 50% based upon the higher heating value of the fuel used in the system;

4. On-site Generation Facilities eligible for net metering; or

5. cogeneration facilities eligible for net metering;

(b) A brief discussion of the effect of 220 CMR 8.07(2)(a) on the Distribution Company's transition charge, including a quantitative estimate of the lost dollar contribution to the Distribution Company's transition charge during the calendar year;

(c) A brief discussion of the effect of 220 CMR 8.07(2)(a) on the Distribution Company's kilowatt hour sales during the calendar year;

(d) An estimate of the percent of the Distribution Company's gross annual revenues that have been lost during the calendar year due to 220 CMR 8.07(2)(a);

(e) A brief narrative identifying all customers that have given notice to the Distribution Company of their plans to reduce electricity purchases due to operations of, or purchases from a facility described in 220 CMR 8.07(2)(a).

Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.