Code of Massachusetts Regulations
220 CMR - DEPARTMENT OF PUBLIC UTILITIES
Title 220 CMR 50.00 - Uniform System Of Accounts For Gas Companies
OPERATING EXPENSE INSTRUCTIONS
Section 2 - Maintenance
Current through Register 1531, September 27, 2024
A. The cost of maintenance chargeable to the various operating expense and clearing accounts includes labor, materials, overheads and other expenses incurred in maintenance work. A list of work operations applicable generally to utility plant is included hereunder. Other work operations applicable to specific classes of plant are listed as functional maintenance expense accounts.
B. Materials recovered in connection with the maintenance of property shall be credited to the same account to which the maintenance cost was charged.
C. Maintenance of property leased from others shall be treated as provided in operating expense instruction 3.
ITEMS
1. Direct field supervision of maintenance.
2. Inspecting, testing, and reporting on condition of plant specifically to determine the need for repairs, replacements, rearrangements and changes and inspecting and testing the adequacy of repairs which have been made.
3. Work performed specifically for the purpose of preventing failure, restoring serviceability or maintaining life of plant.
4. Rearranging and changing the location of plant not retired.
5. Repairing for reuse materials recovered from plant.
6. Testing for, locating and clearing trouble.
7. Net cost of installing, maintaining, and removing temporary facilities to prevent interruptions in service.
8. Replacing or adding minor items of plant which do not constitute a retirement unit. (See gas plant instruction 9.)