Code of Massachusetts Regulations
220 CMR - DEPARTMENT OF PUBLIC UTILITIES
Title 220 CMR 113.00 - Operation, Maintenance, Replacement, and Abandonment of Cast Iron Pipelines
Section 113.08 - Training

Universal Citation: 220 MA Code of Regs 220.113

Current through Register 1531, September 27, 2024

(1) Each operator shall provide and implement a written plan of initial training to instruct all appropriate operating, maintenance, supervisory, and engineering personnel about:

(a) the requirements of 220 CMR 113.00;

(b) the programs and procedures that are developed to comply with 220 CMR 113.00;

(c) the methodology for selecting, prioritizing, and scheduling cast-iron pipe for replacement or abandonment; and

(d) any operating and maintenance plans or procedures adopted to meet the requirements of 49 CFR Part 192 pertaining to cast-iron pipe.

The initial training shall be completed within 210 days of April 12, 1991.

(2) A written plan of continuing instruction shall be developed and carried out at intervals of not more than two years to keep all appropriate personnel current on the knowledge and skills they have gained in the initial program and any modifications that have occurred as a result of the operator's annual review of any program and procedures.

Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.