Code of Massachusetts Regulations
105 CMR - DEPARTMENT OF PUBLIC HEALTH
Title 105 CMR 120.000 - The Control of Radiation
QUALITY ASSURANCE
Section 120.840 - Facility Opening
Current through Register 1531, September 27, 2024
(A) Prior to the acceptance of waste at a facility, the Operator shall notify the Department and the Board that the construction of the facility is complete and in compliance with all requirements of 105 CMR 120.800 and all license conditions, and that the facility is ready to accept waste.
(B) Prior to the acceptance of waste at a facility, the Operator shall file with the Department the waste acceptance criteria, approved by the Board, that will be utilized at the facility.
(C) Upon written notification from the Department that the Operator is in compliance with all the regulations and conditions of the facility license, and upon a determination of compliance with the comprehensive operating contract by the Board, commencement of operations may begin. The Operator shall be required to begin accepting waste within 30 days after such notification.
(D) No person may ship or transport any waste to a facility without the written consent of the Operator.