Section 120.833 - Facility Construction

Current through Register 1531, September 27, 2024

(A) The Operator shall present facility construction plans to be approved by the Department prior to commencement of construction.

(B) The Operator may begin construction once the Department has determined that:

(1) The operator environmental monitoring program and Department environmental monitoring program, together with the detailed site characterization of the site, has yielded comprehensive baseline data.

(2) All required financial assurances have been accepted.

(3) All pre-construction conditions of the facility license have been satisfied.

(C) The Operator shall ensure that construction of the facility meets all the requirements of 105 CMR 120.800 and the license.

(D) The Board shall appoint a resident engineer who shall represent the Board daily at the site during construction of the facility and who shall, in cooperation with officials at each site community, check, inspect, and report to the Board as to events at the construction site.

(E) The Department will periodically inspect the construction process to ensure that the requirements of 105 CMR 120.800 and the license are being met.

(F) The Operator shall construct, install, and make additions and improvements to such structures and equipment as are determined by the Department to be necessary.

Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.