Code of Maryland Regulations
Title 21 - STATE PROCUREMENT REGULATIONS
Subtitle 12 - PROCUREMENT OF ARCHITECTURAL SERVICES AND ENGINEERING SERVICES
Chapter 21.12.02 - Department of Transportation and Department of General Services; A/E Services exceeding $200,000
Section 21.12.02.08 - Compensation for Services
Universal Citation: MD Code Reg 21.12.02.08
Current through Register Vol. 51, No. 19, September 20, 2024
A. Unacceptable Methods. The following methods of compensation are not acceptable:
(1) Cost plus a percentage of cost;
(2) Percentage of construction
cost.
B. The determination of the method of compensation shall be made by the Procurement Agency.
C. Prices shall be negotiated in accordance with State Finance and Procurement Article, § 13-214, Annotated Code of Maryland.
D. Audit. The Procurement Agency shall arrange for pre-audits and post-audits, as required. All rates used in cost-plus-fixed-fee compensations shall be verified.
E. Monitoring.
(1) A follow-up monitoring system to fairly
evaluate the consultants)' performance shall be initiated by the Procuring
Agency. As a minimum, this shall include an evaluation of quality of work,
timeliness of completion, effectiveness, and responsiveness to the agency's
needs.
(2) The Procuring Agency
shall maintain a post-evaluation file for each consultant performing work and
shall be considered in performing their evaluations.
Disclaimer: These regulations may not be the most recent version. Maryland may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.