Section 20.70.06.05 - Pre-Installation Inspections and Tests

Universal Citation: MD Code Reg 20.70.06.05

Current through Register Vol. 51, No. 6, March 22, 2024

A. Approval. A meter may not be placed in service unless:

(1) Its type and design first has been approved by the Commission;

(2) It has been inspected and tested by the utility, or has been certified by the manufacturer to be correct;

(3) Its registration is within the tolerances specified in Regulation .04A of this chapter; and

(4) It has been sealed by the utility.

B. Re-Installation. When any meter is removed from service it shall be repaired if necessary so that it conforms to the registration tolerances specified in Regulation .04A before being placed in service again.

Disclaimer: These regulations may not be the most recent version. Maryland may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.