Code of Maryland Regulations
Title 20 - PUBLIC SERVICE COMMISSION
Subtitle 55 - SERVICE SUPPLIED BY GAS COMPANIES
Chapter 20.55.10 - Work Approval
Section 20.55.10.04 - Work Approval Requirements

Universal Citation: MD Code Reg 20.55.10.04

Current through Register Vol. 51, No. 6, March 22, 2024

A. Each gas company shall incorporate their work approval requirements for both covered and noncovered projects into their written operations and maintenance procedures under 49 CFR Part 192, Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards, as amended, which is incorporated by reference in Regulation .03 of this chapter.

B. Each gas company shall incorporate their training, initial qualification, and requalification requirements for a Relevant Qualified Person into their written operations and maintenance procedures under 49 CFR Part 192, Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards, as amended, which is incorporated by reference in Regulation .03 of this chapter.

C. Licensed professional engineers retained by a gas company shall have the necessary knowledge, experience, and skills regarding natural gas distribution systems to review and certify construction plans for accuracy, completeness, and correctness, but are not subject to §B of this regulation.

D. The following types of designed natural gas infrastructure project work are designated as covered projects and require documented approval by a licensed professional engineer:

(1) New installation or modification that creates or alters the designed operating pressure of a district pressure regulator station or gate station.

(2) Installation of new or substantial reconfiguration of compressor stations.

(3) Installation, uprating, or abandonment of intrastate transmission lines.

(4) Any distribution main piping modifications or replacement work falling within the established district regulator awareness zones established by each operator.

(5) Any construction work on distribution mains which uprates the piping maximum allowable operating pressure.

(6) Installation of distribution mains, including replacements and extension projects, which attach to bridges or other engineered structures.

(7) Trenchless technology installations where the force used to pull the pipe and the path that the pipe follows while being pulled might result in damage to the pipe as a consequence of using that technology.

(8) Peak shaving facility installations and modifications or reconfigurations that would alter its pressure delivery characteristics.

(9) Any other designed natural gas infrastructure project work that presents a material risk of high consequence to public safety as determined by the gas company.

E. All types of designed natural gas infrastructure project work not listed in §D of this regulation are designated as noncovered projects and require documented approval by a relevant qualified person.

F. During emergencies, a relevant qualified person may approve a covered project, in which case documented licensed professional engineer approval shall be required as soon as practical after the emergency has been resolved.

G. The Division may grant a waiver to the regulations in this chapter to a gas company for good cause.

Disclaimer: These regulations may not be the most recent version. Maryland may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.