Code of Maryland Regulations
Title 10 - MARYLAND DEPARTMENT OF HEALTH
Part 1
Subtitle 07 - HOSPITALS
Chapter 10.07.02 - Nursing Homes
Section 10.07.02.44 - Physical Plant - Heating and Cooling
Current through Register Vol. 51, No. 19, September 20, 2024
A. Unless otherwise indicated, all general requirements apply to both new construction and an existing nursing home.
B. Temperatures. A nursing home shall maintain a minimum design temperature of 75°F or 24°C for all occupied areas.
C. Heating System. A nursing home shall be equipped with a properly maintained and operational central heating system. The heating system shall be:
D. Humidity. The humidity shall be controlled according to the guidelines prescribed in the Guidelines for Design and Construction of Residential Health, Care, and Support Facilities.
E. Auxiliary Heat. Appropriate provisions shall be made for emergency auxiliary heat by means of alternative sources of electric power, alternative fuels, or standby equipment.
F. Space Heaters. Space heaters and portable heaters may not be used.
G. Boiler rooms. Boiler rooms shall be provided with sufficient outdoor air to maintain combustion rates of equipment and to limit temperatures in working stations to 97°F or 36°C.
H. Air Conditioning.