Code of Maine Rules
99 - INDEPENDENT AGENCIES
420 - MAINE TURNPIKE AUTHORITY
Chapter 3 - RULES GOVERNING SUPPLEMENTAL GUIDE SIGNS ON THE MAINE TURNPIKE
Section 420-3-3 - Timing of Signage Installation shall be Consistent with Authority Operations

Current through 2024-38, September 18, 2024

The MUTCD states that "sign installations are an integral part of the facility, and as such are best planned concurrently with the development of the highway locations and geometric design. Interstate signing is to be considered and developed as a planned system of installations. An engineering study is sometimes necessary for proper solution of the problems in many individual locations but in additional consideration of an entire route is necessary."

Modification or installation of supplemental guide signs requires review of the surrounding area. Moving or eliminating other signs may be required to achieve a proper overall signing design in accordance with national standards. Signage is typically adjusted every 15-20 years as the life of most of the signs is reached and replacements are planned. In addition, as new facilities are built or new interchanges are built or under major rehabilitation considerations for adjustments in signs will be made. Therefore, requests for changes to signage under this chapter which are granted may not be actually put into effect by the Authority until a later date consistent with the Authority's long term planning and operations.

Disclaimer: These regulations may not be the most recent version. Maine may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.