Code of Maine Rules
99 - INDEPENDENT AGENCIES
420 - MAINE TURNPIKE AUTHORITY
Chapter 2 - REGULATIONS FOR THE INSTALLATION OF LOGO SIGNS ON THE MAINE TURNPIKE
Section 420-2-13 - Logo Permits

Current through 2024-38, September 18, 2024

1. Application for a logo sign shall be made on forms furnished by the Authority. Applications will be processed and permits issued based on criteria developed by the Authority. These criteria will include, but not be limited to:

A. Distance from interchange

B. Number of Annual Visitors

C. Period of Operation (Annual vs. Seasonal)

D. For Attractions, number of activity categories (i.e. cultural, historical, recreational)

2. Competing interchange services for logo signing which exhibit similar characteristics in the categories outlined above may be selected based upon order of form receipt. Prioritization will be given to those service locations that had previously been signed by the Authority on a supplemental guide sign but was removed or is planned to be removed by the Authority.

3. Eligible services who receive a permit shall furnish logo signs constructed to specifications to the Authority. Once a permit is issued, the Authority or its vendor shall be responsible for physically installing logo signs and assemblies.

Disclaimer: These regulations may not be the most recent version. Maine may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.