Code of Maine Rules
10 - DEPARTMENT OF HEALTH AND HUMAN SERVICES
144 - DEPARTMENT OF HEALTH AND HUMAN SERVICES - GENERAL
Chapter 232 - WELL DRILLERS AND PUMP INSTALLERS RULES
Chapter 8 - REQUIREMENTS OF PUMPS
Section 144-232-8-805.0 - PRESSURE TANKS
Universal Citation: 10 ME Code Rules ยง 144-232-8-805.0
Current through 2024-38, September 18, 2024
805.1 Storage capacity: Pressure tanks should be installed to the minimum capacity recommendation of the pump and motor manufacturer. Tanks shall be constructed of materials that are not hazardous to the water quality.
805.2 Relief valve: At least one (1) relief valve shall be required for a submersible pump installation. A shutoff valve shall not be installed between the pump and the relief valve. The installation of a relief valve shall conform to a minimum of the current State of Maine Internal Plumbing Rules Chapter 238, Section 11.
Disclaimer: These regulations may not be the most recent version. Maine may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.