Code of Maine Rules
06 - DEPARTMENT OF ENVIRONMENTAL PROTECTION
096 - DEPARTMENT OF ENVIRONMENTAL PROTECTION - GENERAL
Chapter 594 - STATE CONTRIBUTION TO OVERBOARD DISCHARGE REPLACEMENT PROJECTS
Section 096-594-8 - Design of treatment system

Current through 2024-38, September 18, 2024

The applicant shall secure the services of a qualified individual or consulting firm for a system design.A licensed site evaluator may design subsurface wastewater disposal systems up to 2,000 gallons per day (gpd) in size.A professional engineer is required to design and prepare contract documents for wastewater disposal systems in excess of 2,000 gpd.A copy of the final wastewater system design must be submitted to the department for approval prior to the start of construction.

Disclaimer: These regulations may not be the most recent version. Maine may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.