9.17.1 Generally

Piping must be supported with pipe hooks, metal pipe straps, bands, brackets, or hangers suitable for the size of the piping and must be of adequate strength and quality and located at appropriate intervals so as to prevent or damp out excessive vibration.

9.17.2 Spacing

Spacing of supports shall not be greater than shown in Table 9-1.

Table 9-1

Support of Piping

Steel Pipe, Nominal Size of Pipe (Inches)

Spacing of Supports (Feet)

Nominal Size of Tubing (Inch O.D.)

Spacing of Supports (Feet)

½"

6'

½"

4'

¾" or 1"

8'

5/8" or ¾"

6'

1 ¼" or larger (horizontal)

10"

7/8" or 1"

8'

1 ¼" or larger (vertical)

every floor level

9.17.3 Allowance for Expansion and Contraction

Supports, hangers, and anchors must be installed so as to not interfere with the free expansion and contraction of the piping between anchors. All parts of the supporting equipment must be designed and installed so that they will not disengage by movement of the supporting piping.

Disclaimer: These regulations may not be the most recent version. Maine may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.