Section 658-13-6 - Heat Loss Requirement

Current through 2024-13, March 27, 2024

13.6.1 New Installations of Central Heating Systems

Heat loss system design and system load calculations for all new installations of a central heating system must be performed prior to installation. The licensee must retain a copy of the heat loss system design and system load calculations such that it may be produced for inspection upon request of a Board inspector.

13.6.2 Replacement of Central Heating Systems

A heat loss and/or load calculation must be conducted before replacement of a central heating system. The licensee must retain a copy of the heat loss system design or system load calculations, or the stamped plans of an engineered system, such that they may be produced for inspection upon request of a Board inspector.

Disclaimer: These regulations may not be the most recent version. Maine may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.