Code of Maine Rules
02 - DEPARTMENT OF PROFESSIONAL AND FINANCIAL REGULATION
395 - PLUMBERS' EXAMINING BOARD
Chapter 4 - INSTALLATION STANDARDS
Section 395-4-1 - PLUMBING INSTALLATIONS
Current through 2024-38, September 18, 2024
A. The Plumbers' Examining Board adopts and incorporates herein by reference the International Association of Plumbing and Mechanical Officials 2021 Uniform Plumbing Code, Copyright © 2020, 29th edition, Third Printing, May 2021, as the standard for plumbing installations in the State of Maine, subject to the exclusions and amendments as set forth in this chapter.
The aforementioned 2021 Uniform Plumbing Code, hereinafter referred to as the "UPC," may be purchased from:
International Association of Plumbing and Mechanical Officials
4755 E. Philadelphia Street
Ontario, CA 91761-2816
Telephone: (909) 472-4208 or 1-800-854-2766
Webpage: www.iapmo.org
B. All plumbing installations must comply with the UPC as adopted herein with the exclusions and amendments set forth in this chapter; Title 32, Chapter 49 of the Maine Revised Statutes; and the rules of the board. Plumbing installations must also comply with all applicable statutes or rules of the State and all applicable ordinances, orders, rules and regulations of local municipalities.
C. Exclusions and Amendments
Notwithstanding any provision to the contrary, and for the purposes of this Chapter, only the following persons may apply for and obtain plumbing permits:
...
Exception: This provision shall not apply to any emergency work when it can be proved to the satisfaction of the Local Plumbing Inspector ("LPI") that such work was necessary and that it was not practical to obtain a permit before the commencement of the work. In all emergency cases, a permit must be obtained within four (4) working days or a double permit fee shall be charged.
This provision shall not be interpreted as requiring reinspection fees the first time a job is rejected for failure to be in accordance with the requirements of this code, but as controlling the practice of calling for inspections before the job is ready for inspection or reinspection.
Reinspection fees shall be permitted to be assessed where the approved plans are not readily available to the inspector, for failure to provide access on the date for which the inspection is requested, or for deviating from plans requiring the approval of the Authority Having Jurisdiction.
In instances where reinspection fees have been assessed, no additional inspection of the work will be performed until the required fees have been paid.
Co-extruded ABS (Acrylonitrile Butadiene Styrene) and PVC (Poly Vinyl Chloride) schedule 40 (cellular core) piping systems with referenced standards ASTM F1488 and ASTM F891 shall not be tested with air.
PVC and CPVC (Chlorinated Poly Vinyl Chloride) building supply and water distribution piping systems shall not be tested by air.
Plumbing System. Includes all potable water, alternate water sources, building supply, and distribution pipes; all plumbing fixtures and traps; all drainage and vent pipes; and all building drains and building sewers, including their respective joints and connections, devices, receptors, and appurtenances within the property lines of the premises and shall include potable water piping, potable water treating or using equipment, and water heaters.
Roughing-In. The installation of all parts of the plumbing system that can be completed prior to the installation of fixtures. This includes drainage, water supply, vent piping, and the necessary fixture supports.
Exceptions:
...
...
...