A. Vertical Leaders. Vertical leaders shall be sized for the maximum projected roof area, according to Table 1111.A of this code below. If a vertical offset is 45 degrees or less, the leader can be sized as a vertical pipe. If the offset is greater than 45 degrees, the pipe must be sized as a horizontal pipe.
Table 1111.A Size of Vertical Leaders |
|
Size of Leader or Conductor1 (in) |
Maximum Projected Roof Area (sq ft) |
2 |
720 |
2 1/2 |
1300 |
3 |
2200 |
4 |
4600 |
5 |
8650 |
6 |
13,500 |
8 |
29,000 |
NOTE:
B. Building Storm Drains. Building storm drains shall comply with the following.
Table 1111.B Size of Horizontal Storm Drains |
|||
Diameter of Drain (in) |
Maximum Projected Roof Area for Drains of Various Slopes (sq ft) |
||
1/8 in Slope |
1/4 in Slope |
1/2 in Slope |
|
3 |
822 |
1,160 |
1,644 |
4 |
1,880 |
2,650 |
3,760 |
5 |
3,340 |
4,720 |
6,680 |
6 |
5,350 |
7,550 |
10,700 |
8 |
11,500 |
16,300 |
23,000 |
10 |
20,700 |
29,200 |
41,400 |
12 |
33,300 |
47,000 |
66,600 |
15 |
59,500 |
84,000 |
119,000 |
C. Blockage Avoidance. To avoid stoppages, building drainage piping cannot be reduced in size in the direction of flow throughout its length. i.e., an 8-inch (203-mm) horizontal building storm drain must tie to an 8-inch (203-mm) vertical leader, even if Table 1111.A of this code allows for a smaller size for the vertical leader.
D. Vertical Walls. In sizing roof drains and storm drainage piping, one-half (1/2) of the area of any vertical wall which diverts rain water to the roof shall be added to the projected roof area for inclusion in calculating the required size of vertical leaders and horizontal storm drainage piping.
E. Maximum Rates of Rainfall. Primary roof drain systems shall be designed using Tables 1111.A and 1111.B of this code and adjusted in accordance with §1111. B.2 of this code for the local rainfall for a 60 minute duration and a 100-year return period in Figure 1111.E of this Part. The plumbing official may approve local weather data on the maximum rate of rainfall when available.
Figure 1111.E - Rainfall Rate for Primary Roof Drains (in./hr.)
F. Parapet Wall Scupper Location. The location of parapet wall roof drainage scuppers and overflow scuppers shall be such that discharge can cause no personal injury or property damage. When neither conductor heads nor gutters are used to catch the water, scupper spouts shall extend past the exterior surface of the building to avoid wetting the building surface.
AUTHORITY NOTE: Promulgated in accordance with R.S. 40:4(A)(7) and R.S. 40:5(2)(3)(7)(9)(16)(17)(20).