Louisiana Administrative Code
Title 43 - NATURAL RESOURCES
Part XVII - Office of Conservation-Injection and Mining
Subpart 7 - Statewide Order No. 29-M-5
Chapter 37 - Storage Wells in Solution-Mined Salt Dome Cavities
Section XVII-3719 - Operating Requirements
Current through Register Vol. 50, No. 9, September 20, 2024
A. Cavern Roof. Without exception or variance to these rules and regulations, no cavern shall be used for storage if the cavern roof has grown above the top of the salt stock. The operation of an already permitted storage cavern shall cease and shall not be allowed to continue if information becomes available that shows this condition exists. The Office of Conservation may order the storage well and cavern removed from storage service according to an approved closure and post-closure plan.
B. Remedial Work. No remedial work or repair work of any kind shall be performed on the storage well or cavern without prior authorization from the Office of Conservation. The provision for prior authorization shall also extend to doing mechanical integrity pressure and leak tests, sonar caliper surveys, and all logs, and all logs, including casing inspection logs and through tubing logs; however, a work permit is not required in order to conduct routine interface surveys. The owner, operator, or its agent shall submit a valid work permit request form (Form UIC-17 or successor). Before beginning well or cavern remedial work, the pressure in the cavern shall be relieved, as practicable.
C. Well Recompletion-Casing Repair. The following applies to storage wells where remedial work results from well upgrade, casing wear, or similar conditions. For each paragraph below, a casing inspection log shall be performed on the entire length of the innermost cemented casing in the well before doing any casing upgrade or repair. Authorization from the Office of Conservation shall be obtained before beginning any well recompletion, repair, upgrade, or closure. A storage well that cannot be repaired or upgraded shall remain out-of-service and be closed according to an approved closure and post-closure plan.
D. Multiple Well Caverns. No newly permitted well shall be drilled into an existing cavern until the cavern pressure has been relieved, as practicable, to 0 PSI measured at the surface.
E. Cavern Allowable Operating Pressure
F. Solution Mining Under Gas (Smugging)
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:4 et seq. and R.S. 30:23 et seq.