Louisiana Administrative Code
Title 43 - NATURAL RESOURCES
Part XV - Office of Conservation-Surface Mining
Subpart 5 - Permanent Program Performance Standards
Chapter 53 - Permanent Program Performance Standards: Surface Mining Activities
Section XV-5395 - Coal Processing Waste: Dams and Embankments-Design and Construction
Current through Register Vol. 50, No. 9, September 20, 2024
A. The design of each dam and embankment constructed of coal processing waste or intended to impound such waste shall comply with the requirements of §5333. A and C, modified as follows.
B. Spillways and outlet works shall be designed to provide adequate protection against erosion and corrosion. Inlets shall be protected against blockage.
C. Dams or embankments constructed of or impounding waste materials shall be designed so that at least 90 percent of the water stored during the design precipitation event can be removed within a 10-day period.
D. For dams or embankments constructed of or impounding coal mine waste, at least 90 percent of the water stored during the design precipitation event shall be removed within the 10-day period following the design precipitation event.
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:901-932.