Section XV-5311 - Topsoil: Removal
Current through Register Vol. 50, No. 9, September 20, 2024
A. Timing. Topsoil shall be removed after vegetative cover that would interfere with the use of the topsoil is cleared from the areas to be disturbed, but before any drilling, blasting, mining or other surface disturbance.
B. Materials to be Removed. All topsoil shall be removed in a separate layer from the areas to be disturbed, unless use of substitute or supplemental materials is approved by the office in accordance with §5311. E If use of substitute or supplemental materials is approved, all materials to be redistributed shall be removed.
C. Materials to be Removed in Thin Topsoil Situations. If the topsoil is less than 6 inches, a 6-inch layer that includes the A horizon and the unconsolidated materials immediately below the A horizon, or the A horizon and all unconsolidated material if the total available is less than 6 inches, shall be removed and the mixture segregated and redistributed as the surface soil layer, unless topsoil substitutes are approved by the office pursuant to §5311 E
D. Subsoil Segregation. The B horizon and portions of the C horizon or other underlying layers demonstrated to have qualities for comparable root development shall be segregated and replaced as subsoil, if the office determines that either of these is necessary or desirable to ensure soil productivity consistent with the approved post-mining land use.
E. Topsoil Substitutes and Supplements
F. Limits on Topsoil Removal Area. Where the removal of vegetative material, topsoil or other materials may result in erosion which may cause air or water pollution:
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:901-932.