Louisiana Administrative Code
Title 43 - NATURAL RESOURCES
Part XV - Office of Conservation-Surface Mining
Subpart 5 - Permanent Program Performance Standards
Chapter 53 - Permanent Program Performance Standards: Surface Mining Activities
- Section XV-5301 - Signs and Markers
- Section XV-5303 - Casing and Sealing of Drilled Holes: General Requirements
- Section XV-5305 - Casing and Sealing of Drilled Holes: Temporary
- Section XV-5307 - Casing and Sealing of Drilled Holes: Permanent
- Section XV-5309 - Topsoil: General Requirements
- Section XV-5311 - Topsoil: Removal
- Section XV-5313 - Topsoil: Storage
- Section XV-5315 - Topsoil: Redistribution
- Section XV-5317 - Topsoil: Nutrients and Soil Amendments
- Section XV-5319 - Hydrologic Balance: General Requirements
- Section XV-5321 - Hydrologic Balance: Water Quality Standards and Effluent Limitations
- Section XV-5323 - Hydrologic Balance: Diversions
- Section XV-5325 - Hydrologic Balance: Sediment Control Measures
- Section XV-5327 - Hydrologic Balance: Siltation Structures
- Section XV-5329 - Hydrologic Balance: Discharge Structures
- Section XV-5331 - Hydrologic Balance: Acid-Forming and Toxic-Forming Spoil
- Section XV-5333 - Hydrologic Balance: Impoundments
- Section XV-5335 - Hydrologic Balance: Ground-Water Protection
- Section XV-5337 - Hydrologic Balance: Protection of Ground-Water Recharge Capacity
- Section XV-5339 - Hydrologic Balance: Surface- and Ground-Water Monitoring
- Section XV-5341 - Hydrologic Balance: Transfer of Wells
- Section XV-5343 - Hydrologic Balance: Water Rights and Replacement
- Section XV-5345 - Hydrologic Balance: Discharge of Water into an Underground Mine
- Section XV-5347 - Hydrologic Balance: Post-Mining Rehabilitation of Sedimentation Ponds, Diversions, Impoundments and Treatment Facilities
- Section XV-5349 - Hydrologic Balance: Stream Buffer Zones
- Section XV-5351 - Coal Recovery
- Section XV-5353 - Use of Explosives: General Requirements
- Section XV-5355 - Use of Explosives: Preblasting Survey
- Section XV-5357 - Use of Explosives: Blasting Schedule
- Section XV-5359 - Use of Explosives: Blasting Signs, Warnings and Access Control
- Section XV-5361 - Use of Explosives: Control of Adverse Effects
- Section XV-5363 - Use of Explosives: Records of Blasting Operations
- Section XV-5365 - Disposal of Excess Spoil: General Requirements
- Section XV-5367 - Disposal of Excess Spoil: Valley Fills
- Section XV-5369 - Disposal of Excess Spoil: Head-of-Hollow Fills
- Section XV-5371 - Disposal of Excess Spoil: Durable Rock Fills
- Section XV-5373 - Protection of Underground Mining
- Section XV-5375 - Coal Processing Waste Banks: General Requirements
- Section XV-5377 - Coal Processing Waste Banks: Site Inspection
- Section XV-5379 - Coal Processing Waste Banks: Water Control Measures
- Section XV-5381 - Coal Processing Waste Banks: Construction Requirements
- Section XV-5383 - Coal Processing Waste: Burning
- Section XV-5385 - Coal Processing Waste: Burned Waste Utilization
- Section XV-5387 - Coal Processing Waste: Return to Underground Workings
- Section XV-5389 - Disposal of Noncoal Wastes
- Section XV-5391 - Coal Processing Waste: Dams and Embankments-General Requirements
- Section XV-5393 - Coal Processing Waste: Dams and Embankments-Site Preparation
- Section XV-5395 - Coal Processing Waste: Dams and Embankments-Design and Construction
- Section XV-5397 - Air Resources Protection
- Section XV-5399 - Protection of Fish, Wildlife and Related Environmental Values
- Section XV-5401 - Slides and Other Damage
- Section XV-5403 - Contemporaneous Reclamation
- Section XV-5405 - Backfilling and Grading: General Requirements
- Section XV-5407 - Backfilling and Grading: General Grading Requirements
- Section XV-5409 - Backfilling and Grading: Covering Coal and Acid- and Toxic-Forming Materials
- Section XV-5411 - Backfilling and Grading: Thin Overburden
- Section XV-5413 - Backfilling and Grading: Thick Overburden
- Section XV-5414 - Backfilling and Grading: Previously Mined Areas
- Section XV-5415 - Regrading or Stabilizing Rills and Gullies
- Section XV-5417 - Revegetation: General Requirements
- Section XV-5419 - Revegetation Timing
- Section XV-5421 - Revegetation: Mulching and Other Soil Stabilizing Practices
- Section XV-5423 - Revegetation: Standards for Success
- Section XV-5424 - Revegetation: Standards for Success-Post-Mining Land Use of Pastureland
- Section XV-5425 - Revegetation: Standards for Success-Post-Mining Land Use of Wildlife Habitat
- Section XV-5427 - Cessation of Operations: Temporary
- Section XV-5429 - Cessation of Operations: Permanent
- Section XV-5431 - Post-Mining Land Use
- Section XV-5433 - Roads: General
- Section XV-5435 - Primary Roads
- Section XV-5437 - Other Transportation Facilities
- Section XV-5439 - Support Facilities and Utility Installations
Disclaimer: These regulations may not be the most recent version. Louisiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.