Louisiana Administrative Code
Title 43 - NATURAL RESOURCES
Part XIII - Office of Conservation-Pipeline Safety
Subpart 5 - Liquefied Natural Gas Facilities: Federal Safety Standards
Chapter 77 - Operations [49 CFR Part 193 Subpart F]
Section XIII-7713 - Transfer Procedures [49 CFR 193.2513]
Universal Citation: LA Admin Code XIII-7713
Current through Register Vol. 50, No. 9, September 20, 2024
A. Each transfer of LNG or other hazardous fluid must be conducted in accordance with one or more manuals of written procedures to provide for safe transfers. [ 49 CFR 193.2513(a)]
B. The transfer procedures must include provisions for personnel to:
1. before
transfer, verify that the transfer system is ready for use, with connections
and controls in proper positions, including if the system could contain a
combustible mixture, verifying that it has been adequately purged in accordance
with a procedure which meets the requirements of "Purging Principles and
Practices (incorporated by reference, see §6713)"; [
49 CFR
193.2513(b)(1)]
2. before transfer, verify that each
receiving container or tank vehicle does not contain any substance that would
be incompatible with the incoming fluid and that there is sufficient capacity
available to receive the amount of fluid to be transferred; [
49 CFR
193.2513(b)(2)]
3. before transfer, verify the maximum
filling volume of each receiving container or tank vehicle to ensure that
expansion of the incoming fluid due to warming will not result in overfilling
or overpressure; [
49 CFR
193.2513(b)(3)]
4. when making bulk transfer of LNG into a
partially filled (excluding cooldown heel) container, determine any differences
in temperature or specific gravity between the LNG being transferred and the
LNG already in the container and, if necessary, provide a means to prevent
rollover due to stratification; [
49 CFR
193.2513(b)(4)]
5. verify that the transfer operations are
proceeding within design conditions and that overpressure or overfilling does
not occur by monitoring applicable flow rates, liquid levels, and vapor
returns; [
49 CFR
193.2513(b)(5)]
6. manually terminate the flow before
overfilling or overpressure occurs; and [
49 CFR
193.2513(b)(6)]
7. deactivate cargo transfer systems in a
safe manner by depressurizing, venting, and disconnecting lines and conducting
any other appropriate operations. [
49 CFR
193.2513(b)(7)
]
C. In addition to the requirements of Subparagraph B of this Section, the procedures for cargo transfer must be located at the transfer area and include provisions for personnel to:
1. be in constant attendance
during all cargo transfer operations; [
49 CFR
193.2513(c)(1)]
2. prohibit the backing of tank trucks in the
transfer area, except when a person is positioned at the rear of the truck
giving instructions to the driver; [
49 CFR
193.2513(c)(2)]
3. before transfer, verify that:
a. each tank car or tank truck complies with
applicable regulations governing its use; [
49 CFR
193.2513(c)(3)(i)
]
b. all transfer hoses have been
visually inspected for damage and defects; [
49 CFR
193.2513(c)(3)(ii)
]
c. each tank truck is properly
immobilized with chock wheels, and electrically grounded; and [
49 CFR
193.2513(c)(3)(iii)
]
d. each tank truck engine is shut
off unless it is required for transfer operations; [
49 CFR
193.2513(c)(3)(iv)
]
4. prevent a tank truck
engine that is off during transfer operations from being restarted until the
transfer lines have been disconnected and any released vapors have dissipated;
[
49 CFR
193.2513(c)(4)]
5. prevent loading LNG into a tank car or
tank truck that is not in exclusive LNG service or that does not contain a
positive pressure if it is in exclusive LNG service, until after the oxygen
content in the tank is tested and if it exceeds 2 percent by volume, purged in
accordance with a procedure that meets the requirements of "Purging Principles
and Practices (incorporated by reference, see LAC 43:XIII.6713)". [
49 CFR
193.2513(c)(5)]
6. verify that all transfer lines have been
disconnected and equipment cleared before the tank car or tank truck is moved
from the transfer position; and [
49 CFR
193.2513(c)(6)]
7. verify that transfers into a pipeline
system will not exceed the pressure or temperature limits of the system. [
49 CFR
193.2513(c)(7)
]
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:551.C.
Disclaimer: These regulations may not be the most recent version. Louisiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.