Louisiana Administrative Code
Title 43 - NATURAL RESOURCES
Part XI - Office of Conservation-Pipeline Division
Subpart 6 - Damage Prevention
Chapter 61 - Notifications
Section XI-6103 - Emergency Excavation; Notice Required; Penalty (Formerly section 2709)
Current through Register Vol. 50, No. 9, September 20, 2024
A. The notice required pursuant to §4901 shall not apply to any person conducting an emergency excavation. Oral or electronic notice of the emergency excavation shall be given as soon as practicable to the regional notification center or each operator having underground pipelines located in the area and, if necessary, emergency assistance shall be requested from each operator in locating and providing immediate protection to its underground pipelines.
B. The excavator shall certify in the notice required in Subsection A of this Section that the situation poses an imminent threat or danger to life, health, or property or is the result of an unplanned pipeline outage and requires immediate action and that the excavator, or owner or operator has a crew on site.
C. There is a rebuttable presumption that the excavator failed to give notice as required pursuant to this Section if the excavator failed to give any notice to the regional notification center within the following time periods:
D. The owner or operator of the pipeline facilities shall respond to an emergency notice as soon as practicable under the circumstances.
E. Emergency excavation notices are valid for as long as the emergency situation exists. The type of work and location shall remain consistent with the work described in the excavation notice. If the type of work and location become inconsistent with the emergency excavation notice, then a new excavation notice is required.
AUTHORITY NOTE: Promulgated in accordance with 40:1749.27.