A. No person shall commence construction of any facility (other than a field transmission, flow or gathering line located on a state lease or right-of-way) on state waterbottoms after the effective date of regulations unless the assistant secretary has issued a permit authorizing such construction pursuant to R.S. 30:4 and these rules. For purposes of this rule, construction includes any modification of an existing pipeline by the laying of new pipe, other than the replacement of defective pipe by pipe of the same diameter.
B. Any order, permit, lease, right-of-way or other authorization issued or granted by the state of Louisiana which specifically authorizes construction of a facility, including without limitation a permit issued under the Coastal Zone Management Act, shall satisfy the requirement for a permit under this rule and under R.S. 30:4; provided, however, that all requirements of these regulations, including permit conditions under §305, which are or may become applicable to the facility shall be deemed to be incorporated in such authorization.
C. If a facility required to have a permit under this rule is not deemed to have a permit under §1701 then the person responsible shall apply for a permit hereunder and submit in its application:
D. Within 60 days after receiving an application for a permit hereunder, the assistant secretary shall either issue or deny the permit.
E. A permit issued hereunder shall include appropriate conditions requiring:
F. Within 90 days after completion of construction of a facility, a person responsible for the facility shall submit to the assistant secretary:
G. Any field transmission, flow or gathering line on which construction is commenced after the effective date of these regulations shall, if located in waters of a depth of less than 20 feet, be buried and maintained to a minimum depth of 3 feet. This requirement shall not apply to any portion of such line that is connected to a production facility in current use and located within 500 feet of that facility.
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:4-D through 4-H.