Section V-30304 - Test Pressure [49 CFR 195.304]
Universal Citation: LA Admin Code V-30304
Current through Register Vol. 50, No. 9, September 20, 2024
A. The test pressure for each pressure test conducted under this Chapter must be maintained throughout the part of the system being tested for at least four continuous hours at a pressure equal to 125 percent, or more, of the maximum operating pressure and, in the case of a pipeline that is not visually inspected for leakage during the test, for at least an additional four continuous hours at a pressure equal to 110 percent, or more, of the maximum operating pressure. [ 49 CFR 195.304]
AUTHORITY NOTE: Promulgated in accordance with R.S.30:703
Disclaimer: These regulations may not be the most recent version. Louisiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.