Louisiana Administrative Code
Title 33 - ENVIRONMENTAL QUALITY
Part V - Hazardous Wastes and Hazardous Materials
Subpart 1 - Department of Environmental Quality-Hazardous Waste
Chapter 29 - Surface Impoundments
Section V-2907 - Monitoring and Inspection
Current through Register Vol. 50, No. 9, September 20, 2024
A. The facility must provide the department with 30 days advance notice of the initial liner installation to allow the administrative authority the opportunity to inspect the liner and its installation.
B. During construction and installation, liners (except in the case of existing portions of surface impoundments exempt from LAC 33:V.2903.A) and cover systems (such as membranes, sheets, or coatings) must be inspected for uniformity, damage, and imperfections (e.g., holes, cracks, thin spots, or foreign materials). Immediately after construction or installation:
C. While a surface impoundment is in operation, it must be inspected weekly and after storms to detect evidence of any of the following:
D. Prior to the issuance of a permit, and after any extended period of time (at least six months) during which the impoundment was not in service, the owner or operator must obtain a certification from a qualified engineer that the impoundment's dike, including that portion of any dike which provides freeboard, has structural integrity. The certification must establish, in particular, that the dike:
E. An owner or operator required to have a leak detection system under LAC 33:V.2903.I or J must record the amount of liquids removed from each leak detection system sump at least once each week during the active life and closure period.
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2180 et seq.