Kentucky Administrative Regulations
Title 401 - ENERGY AND ENVIRONMENT CABINET - DEPARTMENT FOR ENVIRONMENTAL PROTECTION
Chapter 48 - Standards for Solid Waste Facilities
- Section 401 KAR 48:005 - Definitions related to 401 KAR Chapter 48
- Section 401 KAR 48:050 - Siting requirements for solid waste landfills
- Section 401 KAR 48:060 - Technical requirements for construction/demolition debris landfill
- Section 401 KAR 48:070 - Design requirements for contained landfills
- Section 401 KAR 48:080 - Liner and cap design requirements for contained landfills
- Section 401 KAR 48:090 - Operating requirements for contained landfills
- Section 401 KAR 48:170 - Technical requirements for residual landfills
- Section 401 KAR 48:200 - Landfarming and composting
- Section 401 KAR 48:205 - Technical requirements for petroleum contaminated soil treatment facilities
- Section 401 KAR 48:206 - Petroleum contaminated soil treatment facility liner soil layer quality assurance and quality control
- Section 401 KAR 48:207 - Petroleum contaminated soil treatment facility liner geosynthetic quality assurance and quality control
- Section 401 KAR 48:208 - Petroleum contaminated soil treatment facility liner high-permeability later quality assurance and quality control
- Section 401 KAR 48:300 - Surface and groundwater monitoring and corrective action
- Section 401 KAR 48:310 - Financial requirements and bonds
- Section 401 KAR 48:320 - Operating requirements for less than one (1) acre construction/demolition debris landfills
Disclaimer: These regulations may not be the most recent version. Kentucky may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.