Kansas Administrative Regulations
Agency 82 - KANSAS CORPORATION COMMISSION
Article 14 - KANSAS UNDERGROUND UTILITY DAMAGE PREVENTION ACT
Section 82-14-3 - Operator requirements
Current through Register Vol. 43, No. 52, December 26, 2024
In addition to the provisions of K.S.A. 66-1806, K.S.A. 66-1807, and K.S.A. 66-1810 and amendments thereto, the requirements specified in this regulation shall apply to each operator.
(a) Each operator shall inform the notification center of its election to be considered as a tier 1 member, tier 2 member, or tier 3 member.
(b) Unless otherwise agreed to between the notification center and the operator, any operator of a tier 2 facility may change its membership election once every calendar year by informing the notification center of the operator's intention on or before November 30 of the preceding calendar year.
(c) Each tier 1 member shall perform the following:
(d) Each tier 2 member shall perform the following:
(e) Each tier 3 member shall perform the following:
(f) Except in cases of emergencies or separate agreements between the parties, each operator of a tier 1 facility shall perform one of the following, within the two working days before the excavation scheduled start date assigned by the notification center:
(g) Except in cases of emergencies or separate agreements between the parties, the operator of a tier 2 facility shall perform one of the following within the two working days before the excavation scheduled start date assigned by the notification center or the tier 2 member or tier 3 member, whichever is later:
(h) Each operator of a tier 2 facility that notifies an excavator of its election to require a tolerance zone of 60 inches shall record and maintain the following records of the notification for at least two years:
(i) Each operator of a tier 2 facility that notifies an excavator of its election not to provide locates for its facilities that are expected to be two feet deeper than the excavator's maximum planned excavation depth shall record and maintain the following records of the notification for at least two years:
(j) If the operator of a tier 2 facility is unable to provide the location of its facilities within a 60-inch tolerance zone, the operator shall mark the approximate location of its facilities to the best of its ability, notify the excavator that the markings could be inaccurate, remain on site or in the vicinity of the excavation, and provide additional guidance to the excavator in locating the facilities as needed during the excavation.
(k) Each tier 2 facility constructed, replaced, or repaired after July 1, 2008 shall be locatable. Location data shall be maintained in the form of maps or any other format as determined by the operator.
(l) The requirement to inform the excavator of the facility location shall be met by marking the location of the operator's facility and identifying the name of the operator with flags, paint, or any other method by which the location of the facility is marked in a clearly visible manner.
(m) In marking the location of its facilities, each operator shall use safety colors substantially similar to five of the colors specified in the American national standards institute standard no. Z535.1-2002, "American national standard for safety color code," not including annex A, dated July 25, 2002 and hereby adopted by reference, according to the following table:
Facility Type | Color |
Electric power distribution lines and transmission lines | Safety red |
Gas distribution and transmission lines, hazardous liquid distribution and transmission lines | Safety yellow |
Telephone, telegraph, and fiber optic system lines; cable television lines; alarm lines; and signal lines | Safety orange |
Potable water lines | Safety blue |
Sanitary sewer main lines | Safety green |
(n) If the facility has any outside dimension that is eight inches or larger, the operator shall mark its facility so that the outside dimensions of the facility can be easily determined by the excavator.
(o) If the facility has any outside dimension that is smaller than eight inches, the operator shall mark its facility so that the location of the facility can be easily determined by the excavator.
(p) The requirement to notify the excavator that the tier 1 operator has no facilities in the area described in the notice of intent of excavation shall be met by performing one of the following:
(q) If the notice of intent of excavation contains a request for a meet on site, the operator shall meet with the excavator at a mutually agreed-upon time within two working days after the day on which the notice of intent of excavation was given.
(r) After attending a meet on site, the operator shall inform the excavator of the tolerance zone of the operator's facilities in the area of the planned excavation within two working days before the excavation scheduled start date that was agreed to at the meet on site.
(s) Any operator may request that the excavator whiteline the proposed excavation site.
(t) If the operator requests that the excavator white-line the excavation site, the operator shall have two working days after the whitelining is completed to provide the location of the tolerance zone.
(u) If the operator requests that the excavator use whitelining at the excavation site, the operator shall document the whitelining request and any subsequent meetings regarding the facility location for that excavation site. The operator shall maintain records of the whitelin-ing documentation for two years after the excavation scheduled start date. The documentation shall include the following:
(v) Each operator that received more than 2,000 requests for facility locations in the preceding calendar year shall file a damage summary report at least semiannually with the Kansas corporation commission. The report shall include information on each incident of facility damage resulting from excavation activity that was discovered by the operator during that period. For each incident, at a minimum the following data, if known, shall be included in the report:
(w) The damage summary report for the first six months of the calendar year shall be due on or before August 1 of the same calendar year. The damage summary report for the last six months of the calendar year shall be due on or before February 1 of the next calendar year.