Kansas Administrative Regulations
Agency 5 - DEPARTMENT OF AGRICULTURE-DIVISION OF WATER RESOURCES
Article 46 - GENERAL PERMITS
Section 5-46-4 - General permits; pipeline crossings
Current through Register Vol. 43, No. 39, September 26, 2024
(a) Before the construction of any pipeline or buried cable crossing of a stream having 50 or more square miles of drainage area above the proposed project site, the project shall meet the requirements of subsection (c) of this regulation. Before construction, the owner shall apply for and obtain a general permit from the chief engineer. The application shall be filed on a form prescribed by the chief engineer.
(b) Any pipeline or buried cable crossings of streams that have fewer than 50 square miles of drainage area above the proposed project site and that meet the requirements of subsection (c) of this regulation shall not be required to have a permit pursuant to K.S.A. 82a-301 et seq., and amendments thereto.
(c) All pipeline or buried cable crossings covered by this regulation shall meet the following requirements:
(d) If any pipeline or buried cable crossing covered by this regulation does not meet the requirements of this regulation, or if the chief engineer determines that a pipeline or cable crossing may have an unreasonable effect on the public interest, public safety, or environmental interests, the right to perform the following shall be reserved by the chief engineer: