(a) If a dam will have a service spillway, the spillway shall be designed and constructed with a lining material that meets the following requirements:

(1) Covers the channel floor and walls up to the depth of flow required to bypass the flows of the storm specified as the detention requirement in K.A.R. 5-40-23(a), at a minimum; and

(2) will not fail during the spillway stability design event specified in K.A.R. 5-40-56(c)(2).

(b) Each design report required by K.A.R. 5-40-2b shall include all hydraulic, structural, and geotechnical design information necessary to show that the criteria in subsection (a) are met.

(c) If a fish screen is installed, the screen shall not impair the functioning of the service spillway. If a fish screen is proposed, the design report shall demonstrate that the screen will not impair the functioning of the service spillway.

Disclaimer: These regulations may not be the most recent version. Kansas may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.