(a) Each application to change the location of a well within the Rattlesnake creek basin by more than 2,640 feet may be approved by the chief engineer if all of the following conditions are met:
(b) The approval of the change in point of diversion shall be subject to the conditions specified in this subsection:
The approval of the application to change the point of diversion shall be subject to review by the chief engineer 10 years after the approval of the change application. If the water level at the new well location has declined in excess of 10 feet from the date the new well was drilled, for the sole purpose of administering wells concerning direct impairment, the new well shall be considered to have the priority of the date of the application to change the point of diversion. The owner of the well shall have the option of applying for another change in point of diversion.
(c) The quantity of water that can be approved for a change in point of diversion meeting the requirements of subsection (a) above shall be determined based on the following tables.
Points
point value for each saturated thickness at quantity of water authorized in two-mile-radius feet of decline in two-mile-radius circle
column at right proposed well site, in feet circle around proposed well, in acre-feet around proposed well since pre-development
1 146 + 0-1,500 0-4
2 111-145 1,501-3,000 5-8
3 91-110 3,001-4,500 9-12
4 66-90 4,501-6,000 13-16
5 41-65 6,001 + 17-20
Percent of a water right that can be moved to a new location
number of points scored percent of water right that can be moved to new well location
by proposed well
3-6 100
7-9 90
10-12 80
13-15 70