Kansas Administrative Regulations
Agency 5 - DEPARTMENT OF AGRICULTURE-DIVISION OF WATER RESOURCES
Article 19 - LOCAL ENHANCED MANAGEMENT AREAS
Section 5-19-5 - Review and modification of a designated LEMA
Current through Register Vol. 43, No. 39, September 26, 2024
(a) Once a LEMA has been designated by the chief engineer, the corrective controls in the LEMA plan shall remain in place until the LEMA expires pursuant to the terms of the LEMA plan or until the LEMA plan is changed.
(b) If any proposed changes result from a formal review of the LEMA plan pursuant to K.S.A. 82a-1041 and amendments thereto or as required by the LEMA plan, the proposed changes with the chief engineer's findings shall be sent to the GMD's board of directors following the formal review hearing. The GMD's board of directors shall have 60 days to review the proposed changes and approve, reject, or amend the proposed changes.
(c) Each hearing to consider changes in a designated LEMA and each formal review hearing shall be conducted pursuant to the hearing requirements in K.A.R. 5-193, unless the existing LEMA plan prescribes different or additional procedural requirements for a formal review.
(d) In addition to any topics required by the LEMA plan to be reviewed, each LEMA plan formal review hearing shall, at a minimum, include review and consideration of the effectiveness of the current corrective controls to meet the LEMA plan's stated goal. This subsection shall not serve as a limitation on topics that the presiding officer may hear or that the public may present during a formal review.