Kansas Administrative Regulations
Agency 5 - DEPARTMENT OF AGRICULTURE-DIVISION OF WATER RESOURCES
Article 19 - LOCAL ENHANCED MANAGEMENT AREAS
Section 5-19-2 - LEMA plans
Current through Register Vol. 43, No. 39, September 26, 2024
(a) Before a GMD"s board of directors recommends formal approval of a LEMA plan and submission to the chief engineer for review, the GMD's board of directors or staff may request the division to assist in the development of the LEMA plan or to informally review the LEMA plan.
(b) In addition to the requirements for LEMA plans specified in K.S.A. 82a-1041 and amendments thereto, each GMD that recommends approval of a LEMA plan and formally submits the LEMA plan to the chief engineer shall ensure that the LEMA plan includes the following:
(c) A separate memorandum containing a summary of the public outreach conducted by the GMD before recommending the LEMA plan for approval shall be submitted simultaneously with the LEMA plan and shall include a description of any changes made to the LEMA plan due to any public comments.
(d) If the stated goal of a LEMA plan is to improve water quality, the GMD's board of directors or staff may consult with the chief engineer before formal submission of the proposed LEMA plan to determine which requirements in subsections (b) and (c) are applicable and to determine any other information necessary in order for the chief engineer to perform a review of the LEMA plan.