Kansas Administrative Regulations
Agency 5 - DEPARTMENT OF AGRICULTURE-DIVISION OF WATER RESOURCES
Article 13 - SAND AND GRAVEL PIT OPERATIONS
Section 5-13-5 - Approval of pit operations that are opened or expanded after the effective date of this regulation

Universal Citation: KS Admin Regs 5-13-5

Current through Register Vol. 43, No. 39, September 26, 2024

Except as set forth in K.A.R. 5-13-4, pit operations that are excavated or expanded after the effective date of this regulation and that have a substantial adverse impact on the area groundwater supply shall meet one of the following conditions:

(a) Receive prior approval of the chief engineer for a new permit to appropriate an annual quantity of water sufficient to offset the evaporation caused by exposing the groundwater table in a manner described in K.A.R. 5-13-7;

(b) acquire existing water rights and receive approval of the chief engineer to change the point of diversion, place of use, and the use made of water to authorize the water rights to be used for the project in a manner described in K.A.R. 5-13-7;

(c) acquire and take out of production sufficient water rights in the manner described in K.A.R. 5-13-7 to offset the net average annual evaporation caused by exposing the groundwater table; or

(d) any combination of the above.

Disclaimer: These regulations may not be the most recent version. Kansas may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.