Kansas Administrative Regulations
Agency 49 - DEPARTMENT OF LABOR
Article 52 - LOW PRESSURE HEATING BOILERS
Section 49-52-17 - Emergency shutoff switches

Universal Citation: KS Admin Regs 49-52-17
Current through Register Vol. 43, No. 12, March 20, 2024

An emergency shutoff switch shall be installed on each hot water supply boiler, on each boiler of any size that is equipped with power burners, and on each boiler with a BTUH input of 400,000 or more, regardless of burner type. Each heating and power boiler shall have an emergency shutdown switch installed by each exit to meet the requirements of NFPA 70, "national electrical code," 2002 edition, which is adopted by reference, and ASME CSD-1, as adopted in K.A.R. 49-45-27. Each boiler with an input of 12,500,000 BTUH or more shall meet the requirements of NFPA 70 and NFPA 85, 85A, 85F, and 86, as adopted in K.A.R. 49-45-37 through K.A.R. 49-45-40 . Each emergency shutdown switch shall be marked for easy identification.

Disclaimer: These regulations may not be the most recent version. Kansas may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.