Kansas Administrative Regulations
Agency 4 - DEPARTMENT OF AGRICULTURE
Article 4 - COMMERCIAL FERTILIZERS
Section 4-4-931 - Approved secondary containment of bulk fertilizer; general requirements
Current through Register Vol. 43, No. 52, December 26, 2024
(a) Primary containment of liquid bulk fertilizer shall be located within a secondary containment area. Diked areas shall be constructed with a base, perimeter wall and sloped floor drain, except as provided by K.A.R. 4-4-934.
(b) The diked secondary containment area for fluid bulk fertilizer shall be physically separated and distinct from any secondary containment area for pesticides or other nonfertilizer materials; however adjoining secondary containment areas may share common walls.
(c) The diked area for secondary containment of storage facilities shall be able to contain, below the height of the dike, at least 110% of the capacity of the largest storage container plus the volume displaced by all other storage containers, fixtures, and materials located within the diked area.
(d) All pumps used for handling liquid fertilizer shall be located within the secondary containment structure or area.
(e) Except where used as a method of monitoring a secondary containment system, drainage within or underlying the area to be diked shall be eliminated.
(f) This regulation shall apply to: