Kansas Administrative Regulations
Agency 28 - DEPARTMENT OF HEALTH AND ENVIRONMENT
Article 19 - AMBIENT AIR QUALITY STANDARDS AND AIR POLLUTION CONTROL
Section 28-19-82 - Fee determination basis
Universal Citation: KS Admin Regs 28-19-82
Current through Register Vol. 43, No. 39, September 26, 2024
(a) The fee to be collected for determining and monitoring the environmental impact of a power generation facility during any 12 month period included under the provisions of K.A.R. 28-19-81(a) shall be determined upon the basis of the type of fuel used to power the facility and the generating design capacity of the facility. The maximum fee for any facility powered by coal or nuclear energy shall be based on the following formula:
Impact Monitoring Fee = G.M. * C.M.y / T.G.M.y + G.Q.R. * C.Q.R.y / T.G.Q.R.y
When using the formula, the following values shall be used:
1. G.M. = the generating design
capacity for that particular facility which is monitored with sampling
equipment operated by the department of health and environment;
2. T.G.M.y = the sum of the generating design
capacities for all facilities in the state powered by the same type of fuel
that are monitored with identical sampling equipment operated by the department
of health and environment during the same 12 month period;
3. C.M.y = the sum of all the costs of the
department of health and environment during the same 12 month period for
operating identical sampling equipment at each power generation facility
powered by the same type of fuel;
4. G.Q.R. = the generating design capacity
for that particular facility where monitoring activities conducted by the owner
or operator are subject to quality review and evaluation by the department of
health and environment;
5.
T.G.Q.R.y = the sum of the generating design capacities for all facilities in
the state powered by the same type of fuel where monitoring activities
conducted by the owner or operator are subject to identical quality review and
evaluation by the department of health and environment during the same 12 month
period; and
6. C.Q.R.y = the sum
of the costs of the department of health and environment during the same 12
month period for providing identical quality review and evaluation of
monitoring activities conducted by the owner or operator at each power
generation facility powered by the same type of fuel.
Disclaimer: These regulations may not be the most recent version. Kansas may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.