Section 28-16-165 - Municipal, commercial, and industrial soil liners: postconstruction testing
Current through Register Vol. 43, No. 39, September 26, 2024
(a) Each permit applicant or permittee proposing a new municipal, commercial, or industrial wastewater treatment lagoon that will employ a soil liner system shall, when submitting construction plans and specifications to KDHE for review and consideration for approval, also submit information addressing each method to be employed for postconstruction testing of the soil liner for compliance with the required maximum soil liner seepage rate. Each proposed test method shall provide an appropriate degree of monitoring sensitivity and accuracy in addressing the following test variables:
(b) Within 45 days following the completion of construction, the permittee or applicant shall submit to the department a certification and, if requested, any supporting documentation, confirming that the wastewater lagoon and the wastewater lagoon liner system were constructed in accordance with the plans and specifications approved by the secretary.
(c) The certification specified in subsection (b) shall be signed by a licensed professional engineer who monitored the construction activities and installation of the soil liner system. The certification shall be based on actual observations by the licensed professional engineer, or designee, during construction and any field or laboratory data developed during or following construction.
The construction activities and any sample collection for field or laboratory data developed during or following construction shall be directly observed by the licensed professional engineer or designee. The monitoring of construction activities or the collection of samples or data shall be conducted by the licensed professional engineer or a designee under the licensed professional engineer's direct supervision.
(d)
The permittee or permit applicant shall provide a certification signed by the licensed professional engineer as to whether or not the soil liner meets the required maximum soil liner seepage rate.
(e) Each permit applicant, when directed by the secretary, shall notify the department a minimum of two days before performing any soil liner seepage testing to allow the opportunity for department staff to witness the test.
(f) Postconstruction testing shall not be required for erosion-control sediment ponds associated with construction activities.