Indiana Administrative Code
Title 675 - FIRE PREVENTION AND BUILDING SAFETY COMMISSION
Article 30 - INDIANA BOILER AND PRESSURE VESSEL RULES
Rule 6 - New Installations of Boilers
Section 6-2 - Inspection; stamping of serial number
Current through September 18, 2024
Authority: IC 22-13-2-8
Affected: IC 22-15-6
Sec. 2.
(a) Upon completion of the installation of a boiler, it shall be inspected by an inspector. At the time of the first operating permit inspection, the inspector shall assign and attach a state registration number, preceded by the letters "IN". The letters and figures shall not be less than one-fourth (1/4) inch in height and shall be arranged as follows:
IN 123456
(b) The number assigned shall be one (1) from the series provided to the inspector under 675 IAC 30-3-18.
(c) The number shall not be concealed by lagging or paint and shall be visible at all times.
Transferred from the Boiler and Pressure Vessel Rules Board ( 680 IAC 2-6-2) to the Fire Prevention and Building Safety Commission ( 675 IAC 30-6-2) by P.L. 249-2019, SECTION 15, effective July 1, 2019.