Indiana Administrative Code
Title 675 - FIRE PREVENTION AND BUILDING SAFETY COMMISSION
Article 30 - INDIANA BOILER AND PRESSURE VESSEL RULES
Rule 3 - Administration
Section 3-11 - Inspection reports

Universal Citation: 675 IN Admin Code 3-11

Current through September 18, 2024

Authority: IC 22-13-2-8

Affected: IC 22-15-6

Sec. 11.

(a) The first operating permit inspection of a boiler shall be reported on a form patterned after Form NB-5 set forth in Part 2 of the NBIC. Subsequent operating permit inspections of these objects shall be reported on a form patterned after Form NB-6 set forth in Part 2 of the NBIC.

(b) The first operating permit inspection of an unfired pressure vessel shall be reported on a form patterned after Form NB-5 in Part 2 of the NBIC. Subsequent operating permit inspections of these objects shall be reported on a form patterned after Form NB-7 in Part 2 of the NBIC.

(c) The inspection reports mentioned in subsections (a) and (b) shall be submitted to the division within thirty (30) days of the date of the inspection. The results of inspections shall be reported immediately to the division whenever a hazardous condition concerning a boiler or unfired pressure vessel is found to exist.

Transferred from the Boiler and Pressure Vessel Rules Board ( 680 IAC 2-3-11) to the Fire Prevention and Building Safety Commission ( 675 IAC 30-3-11) by P.L. 249-2019, SECTION 15, effective July 1, 2019.

Disclaimer: These regulations may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.