Indiana Administrative Code
Title 675 - FIRE PREVENTION AND BUILDING SAFETY COMMISSION
Article 15 - INDUSTRIALIZED BUILDING SYSTEMS
Rule 1.6 - Schedule of Fees for Industrialized Building Systems and Mobile Structures
Section 1.6-3 - Penalty fees
Current through September 18, 2024
Authority: IC 22-12-6-1; IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2
Affected: IC 22-12; IC 22-13; IC 22-15
Sec. 3.
(a) In accordance with 675 IAC 15-1.2-3, it shall be unlawful for production of an industrialized building system or mobile structure to begin without first obtaining a construction design release.
(b) The following fees are applicable if production is started before the issuance of a design release:
(1) System plan review, including structural/typical systems: | |
(A) filing fee | $60 |
(B) residential, add-a-room, or duplex | $6403 |
(C) commercial | $1,0103,4 |
(2) Addenda, including structural/typical systems: | |
(A) filing fee | $60 |
(B) residential, add-a-room, or duplex | $1703 |
(C) commercial | $210 3,4 |
Notes:
3Includes only the original floor plan. A one hundred dollar ($100) fee is charged for each additional floor plan. Crawlspace or basement plans are considered a floor plan.
4Includes two (2) units as a completed structure. A one hundred dollar ($100) fee is charged for each additional module unit.