Indiana Administrative Code
Title 675 - FIRE PREVENTION AND BUILDING SAFETY COMMISSION
Article 15 - INDUSTRIALIZED BUILDING SYSTEMS
Rule 1.2 - Administrative Rules for Industrialized Building Systems and Mobile Structures
Section 1.2-11 - Addenda to released system
Current through September 18, 2024
Authority: IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2; IC 22-15-3-4
Affected: IC 22-12; IC 22-15
Sec. 11.
(a) An addendum application shall be filed with the office of the state building commissioner for any proposed addition or revision to a released system plan, which could include any of the following:
(b) All design, specification, or construction process changes that affect a released system plan shall be filed by the manufacturer in the same manner as required by section 3 of this rule.
(c) Signatures and affirmations in compliance with section 4 of the rule [section 4 of this rule] are required, if applicable.
(d) An addendum shall include any pertinent information as described in section 5 of this rule.
(e) A maximum of six (6) addenda may be made to a released system plan before the system plan must be resubmitted.
(f) The fees required by 675 IAC 15-1.6 shall be submitted with the application.
(g) The following revisions or changes do not require an addendum application to be filed: