Section 15-5 - Cost estimate for post-closure care
Current through September 18, 2024
Authority: IC 13-14-8; IC 13-22-2-4
Affected: IC 13-22-2; 40 CFR 264.144
Sec. 5.
(a) The owner or operator of a disposal surface impoundment, disposal miscellaneous unit, land treatment unit, landfill unit, surface impoundment, or waste pile, required under 40 CFR 264.228 and 40 CFR 264.258 to prepare a contingent closure and post-closure plan shall keep at the facility a detailed written estimate, in current dollars, of the annual cost of post-closure monitoring and maintenance of the facility in accordance with the applicable post-closure regulations in 40 CFR 264.117 through 40 CFR 264.120, 40 CFR 264.228, 40 CFR 264.258, 40 CFR 264.280, 40 CFR 264.310, 40 CFR 264.603, and the following:
(b) During the active life of the facility, the owner or operator shall adjust the post-closure cost estimate for inflation within sixty (60) days prior to the anniversary date of the establishment of the financial instrument used to comply with section 6 of this rule. For owners or operators using the financial test or guarantee, the post-closure cost estimate must be updated for inflation within thirty (30) days after the close of the firm's fiscal year and before the submission of updated information to the commissioner as specified in section 6(g)(5) of this rule. The adjustment may be made by recalculating the post-closure cost estimate in current dollars or by using an inflation factor derived from the most recent implicit price deflator for gross national product published by the U.S. Department of Commerce in its Survey of Current Business, specified as follows:
(c) During the active life of the facility, the owner or operator shall revise the post-closure cost estimate within thirty (30) days after the commissioner has approved the request to modify the post-closure plan, if the change in the post-closure plan increases the cost of post-closure care. The revised post-closure cost estimate must be adjusted for inflation as specified in subsection (b).
(d) The owner or operator shall keep the following at the facility during the operating life of the facility: