Indiana Administrative Code
Title 329 - SOLID WASTE MANAGEMENT DIVISION
Article 10 - SOLID WASTE LAND DISPOSAL FACILITIES
Rule 17 - Municipal Solid Waste Landfill Liner System; Design, Construction, and CQA/CQC Requirements
Section 17-16 - Municipal solid waste landfill liner system; post construction care requirements
Current through September 18, 2024
Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 16.
The project engineer shall ensure that proper post construction care is provided to protect the landfill design components from damage after construction is completed. Post construction care requirements include the following:
(1) Upon completion of soil liner construction:
(2) Upon completion of geomembrane seaming:
(3) Upon completion of drainage layer construction, steps must be taken to prevent damage to the drainage layer from fines related to wind borne or water borne sedimentation.
(4) Upon completion of the drainage layer filter installation, if the optional filter is installed, steps must be taken to prevent damage from fines related to wind borne or water borne sedimentation.
(5) Any additional requirements necessary to obtain adequate post construction care of the liner system, as specified in the construction plan or as determined by the commissioner.