Indiana Administrative Code
Title 329 - SOLID WASTE MANAGEMENT DIVISION
Article 10 - SOLID WASTE LAND DISPOSAL FACILITIES
Rule 15 - Municipal Solid Waste Landfills; Plans and Documentation to be Submitted with Permit Application
Section 15-3 - Cross-sectional drawing and detail requirements
Current through September 18, 2024
Authority: IC 13-14-8-7; IC 13-15; IC 13-19-3
Affected: IC 13-18; IC 13-20; IC 36-9-30
Sec. 3.
(a) A permit application for a new MSWLF or a lateral expansion must be accompanied by a minimum of two (2) intersecting cross-sectional drawings. The drawings must include the following:
(b) In addition to the two (2) cross-sectional drawings required in subsection (a), a permit application for a new MSWLF or a lateral expansion must be accompanied by a minimum of two (2) geological cross-sections. The two (2) geological cross-sections must intersect, and the locations of the sections indicated on the existing feature plan or the piezometric contour map. Each geologic cross-sectional drawing must have horizontal and vertical bar scales and depict the following:
(c) A permit application for a new MSWLF or a lateral expansion must be accompanied by detail drawings that are cross-sectional of the: