Indiana Administrative Code
Title 329 - SOLID WASTE MANAGEMENT DIVISION
Article 10 - SOLID WASTE LAND DISPOSAL FACILITIES
Rule 15 - Municipal Solid Waste Landfills; Plans and Documentation to be Submitted with Permit Application
Section 15-1 - General requirements
Universal Citation: 329 IN Admin Code 15-1
Current through September 18, 2024
Authority: IC 13-14-8-7; IC 13-15; IC 13-19-3
Affected: IC 13-20; IC 25-17.6-1-6.5; IC 36-9-30
Sec. 1.
(a) A permit application for a new MSWLF or a lateral expansion must be accompanied by the following plans and documentation:
(1) Plot
plans as specified under section 2 of this rule.
(2) Cross-sectional drawings and details as
specified under section 3 of this rule.
(3) A hydrogeologic site investigation report
as specified under sections 4 and 5 of this rule.
(4) An operational plan of the proposed MSWLF
as specified under section 6 of this rule.
(5) A CQA/CQC plan as specified under section
7 of this rule.
(6) Calculations
and analyses pertaining to MSWLF design as specified under section 8 of this
rule.
(7) An explosive gas
management plan as specified under
329 IAC
10-20-17.
(8) A closure plan as specified under
329 IAC
10-22-2.
(9) A post-closure plan, as specified under
329 IAC
10-23-3.
(10) A quality assurance project plan as
specified under
329 IAC
10-21-2(b)(13).
(11) A sampling and analysis plan as
specified under
329 IAC
10-21-2.
(12) A general description for developing the
statistical evaluation plan that is required by
329 IAC
10-21-6(c). The description must
include a time frame for submitting the statistical evaluation plan.
(13) If applicable, a baled waste management
plan as specified under section 9 of this rule.
(14) A leak detection plan as specified under
section 10 of this rule.
(15) A
leachate collection contingency plan as specified under section 11 of this
rule.
(16) A storm water pollution
prevention plan as specified under section 12 of this rule.
(17) Other plans as may be required by the
commissioner based on particular site or facility conditions.
(b) Plans and documentation that accompany a permit application for a new MSWLF or a lateral expansion must be certified as follows:
(1) The hydrogeologic
site investigation report required in subsection (a)(3) must be certified by a
licensed professional geologist or a qualified ground water scientist, either
of whom shall have educational or professional experience in hydrogeology or
ground water hydrology.
(2) With
the exception of the hydrogeologic site investigation report and the sampling
and analysis plan, all plans and documentation required in subsection (a) must
be certified by a registered professional engineer.
(c) A full set of plans and documentation required by this section must accompany each of the five (5) copies of the permit application required in 329 IAC 10-11-2.1(c).
(d) All plans and documentation must be properly titled.
Disclaimer: These regulations may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.